New Project in Oman
Tecfire recently acquired another project in Oman.
The new project is at the Ideal Med Muscat Hospital. Tecfire will be providing it’s SteelFire Fire-rated S50/70 Glass System which is tested and certified as per European Standard.
S50/70 is a range of non-thermal broken fire-rated glass systems with galvanized or stainless steel frames. The minimized profile guarantees great aesthetic results. These systems are tested and certified to comply with E and EW classifications from 30 up to 240 minutes of fire resistance.
The project is in collaboration with Khalil Projects Development Intl, a specialized fabricator, designer, and manufacturer of all kinds of Aluminium, PVC, & Glass Joinery Products located at Barka, Muscat, and in Sultanate of Oman.
Latest projects
Latest updates
-
Tecfire Gears Up for BAU 2025:...
November 22, 2024 -
TECFIRE MEA Establishes Strategic Partnership with...
November 8, 2024 -
Philippe Starck’s Almazara Museum of Ronda...
October 31, 2024 -
TECFIRE Participates in the expansion of...
October 24, 2024 -
A look at Tecfire in GlassBuild...
October 17, 2024 -
TECFIRE Supplies Advanced STEELFIRE S50/70 Systems...
September 25, 2024 -
Tecfire to Showcase Fire-Rated Glazing Solutions...
September 23, 2024 -
TECFIRE Enhances Safety at Suliman S....
August 23, 2024 -
TECFIRE Enhances Safety at Chamartín High-Speed...
August 6, 2024 -
Tecfire’s Success at Latin America’s Premier...
July 17, 2024