New Project in Oman

Tecfire recently acquired another project in Oman.
The new project is at the Ideal Med Muscat Hospital. Tecfire will be providing it’s SteelFire Fire-rated S50/70 Glass System which is tested and certified as per European Standard.
S50/70 is a range of non-thermal broken fire-rated glass systems with galvanized or stainless steel frames. The minimized profile guarantees great aesthetic results. These systems are tested and certified to comply with E and EW classifications from 30 up to 240 minutes of fire resistance.
The project is in collaboration with Khalil Projects Development Intl, a specialized fabricator, designer, and manufacturer of all kinds of Aluminium, PVC, & Glass Joinery Products located at Barka, Muscat, and in Sultanate of Oman.
Latest projects
Latest updates
-
Tecfire Meets U.S. Specification Standards Through...
January 23, 2026 -
TECFIRE MEA Delivers Advanced Fire-Rated Solutions...
January 9, 2026 -
Hospital Puertollano Integrates Tecfire’s Certified Alufire...
November 15, 2025 -
TECFIRE MEA Completes Fire-Rated Door Installation...
November 5, 2025 -
TECFIRE Group Named Finalist at the...
October 29, 2025 -
TECFIRE Group CEO Jorge de la...
October 15, 2025 -
TECFIRE Completes Advanced Fire Safety Installation...
October 7, 2025 -
Arabian Mirror Features Dr. Amir Abdullatif...
October 2, 2025 -
TECFIRE MEA Celebrates the 95th Saudi...
September 22, 2025 -
TECFIRE at the Forefront in One...
September 17, 2025
